Visit the Craftsman Home Remodeling Website
Friday, December 7, 2007
Neighborhood Church Annual Yule Parlor Parade Homes Tour
Thursday, May 31, 2007
Dining Room Table Being Built
The table is modeled after a table in the Robinson House, another Greene and Greene design. With both leaves in, it can comfortably seat 14, without the leaves it can easily seat 8. It weighs in at about 150 lbs for the base and 150 lbs for the top. The extensions are wood sliding on wood, there are no metal sliders. Also notice that your knees won't hit anywhere around the table.
Saturday, May 26, 2007
The Mailbox Post and Mailbox Get Installed
Saturday, May 12, 2007
Sanded and Stained Front Door and Garage
Wednesday, March 28, 2007
Adding a Barbecue Island
The block was built just off the house. We tied it in using the stone veneer to make it look like one wall.
The structure was framed out with aluminum studs. The dark green posts are steel.
The gas line was run in from under the house.
Golden Buckskin flagstone was used on the top to match the patio and the face is stone. It looks like the barbecue island was here all along.
Sunday, December 3, 2006
Garage Floor Upgraded with RaceDeck
The pieces snap together like a puzzle making it real fast and easy to complete. The hardest part was emptying and refilling my garage. The installation below took all of 2 hours.
Thursday, September 28, 2006
Construction is Complete But Who Is The City Forester?
• Most everything is done now and we are in the process of moving in. In this city, to get signed off, the City Forester must sign off the inspection report. He came over, pulled out his spray paint and put this circle 7 feet off the street in the middle of my front yard and said you will plant a 24" box, Japanese Cherry Tree a.k.a. Pink Cloud. Since this is in the City right of way, I am basically giving the city a gift per their direction. In my opinion, there are now too many trees in the front yard as it was perfectly balanced. Time will tell how it all fills out.
• Code states that glass doors must be put in all interior fireplaces. There is a fireplace store in town that rents doors for 30 days to get through inspection for just over $200. It's one of their standard services!!!
• All that is left to do is minor stuff; low voltage lighting, seal the fence and new gates, make the stained glass for the front door, kitchen, and entertainment center doors, etc.
• There is one more thing I forgot. We had the rear patio fireplace stone redone to get rid of the seam at the 45 degree bend in the wall. While that was accomplished, the rest of the stone was redone but not to my satisfaction. I'm going to redo the opening and face of the fireplace again.
• I am hoping to have the final pictures online by Thanksgiving. There are a lot and I still need to categorize and annotate them all.
And last but not least, there is a third child on the way that is due at the end of November. There is a struggle with my gym being turned into a baby's room. For now, we are going to share it as I will not give it up that easily and the baby will mostly be in our room for the next couple of years. Maybe by then I will have to remodel to add another room! Just kidding....you can put a fork in it because this house is done!!!