Visit the Craftsman Home Remodeling Website
Thursday, December 23, 2004
Structural Engineer Needs to Redesign to Save Tree
We ran into a little snag today. A footing (~8 ft. deep) can't be put in because it is adjacent to the date palm tree. The contractor called me over to the house and by 9AM he was on the phone with the structural engineer for a redesign. Since we can't put the footing in (kill the tree) or move the tree (block the view), we are going to put in a 22 ft steel beam (1200 pounds) to cantilever the upper deck.
Labels:
Construction,
engineer,
Foundation,
Remodel,
tree
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment