The first stretch of dry weather is finally here. The last 2 1/2 weeks have been nothing but rain, about 10 inches worth. The outside trenches have water in them but on the other hand, the demo guys are having a field day. There are now 10 guys working on the site. Five of them are under the house digging a massive trench for the foundation reinforcement. Things should happen quickly now.
Visit the Craftsman Home Remodeling Website
Tuesday, January 11, 2005
Foundations and Rain
Monday, December 27, 2004
Roof Stays Due to Rain
It started to rain so a last minute decision was made to not remove the roof.
Thursday, December 23, 2004
Structural Engineer Needs to Redesign to Save Tree
Wednesday, December 22, 2004
Save the Hardwood Floor?
With all of the cutting away of the floor for the foundation reinforcement and the rain we have been having, today we decided that it is more trouble than it's worth to save the hardwood floor in the living room. This is 2 1/4" quartersawn oak at about $12/sq ft installed. With all of the holes in it, it would be very hard to match new to existing wood without seeing where it was patched. Also, the wood is only 1/2" thick instead of the standard 3/4". This just complicated the problem.
The middle of my living room floor is being cut so the foundation can be reinforced.
Friday, November 12, 2004
Contruction Permit Issued!
The Art Jury finally stamped the drawings allowing the City to issue the construction permit.
It only took 22 months and $40,000 just to get to this point! Now let's build it!
It only took 22 months and $40,000 just to get to this point! Now let's build it!
Tuesday, November 9, 2004
Art Jury Reviews Final Details
The Art Jury finally reviewed the final details for a wall cap, roofline, and chimney. That was what they were holding up the permits for. All of these these items are aesthetic and located at the top of the house. None of these items would have impacted the foundation permit.
Wednesday, September 29, 2004
Structural Plan Check Cleared/Partial Foundation Permit Issued
The structural plan check was cleared today with the City building inspector.
The City also issued us a partial foundation permit. It was partial because the Art Jury wanted to see some aesthetic details before allowing any work on the patio or front porch foundations. Total overkill in my opinion!
The City also issued us a partial foundation permit. It was partial because the Art Jury wanted to see some aesthetic details before allowing any work on the patio or front porch foundations. Total overkill in my opinion!