Visit the Craftsman Home Remodeling Website

Showing posts with label Pathway. Show all posts
Showing posts with label Pathway. Show all posts

Tuesday, July 25, 2006

Another Painting Lesson Learned, Stair Railing Being Refinished, Electrical Done, Pond Built

When will it end, you ask? Within a month is my latest prediction. Here's why:
• Skim-coated all walls in house in preparation for paint. Individual patching of blemishes was not working and we needed to overhaul all walls.

LESSON LEARNED: An eggshell finish is great for a house with kids but it's also great at pointing out every imperfection in the wall. If you don't have kids then definitely use a flat paint. We are using a flat paint for the ceilings.

• Painting is all that is left with the walls. Stefan is continuing and 3 more painters come in next week to finish the place out.
• The stair railing has been fit and will be sent out for refinishing.
• All data, phone, and cable has been hooked up and patch panels installed in garage.
• All exterior wall sconces installed.

Craftsman wall sconce with a peacock filigreeCraftsman wall sconce with an oak filigree

• Office is 100% complete.
• Backyard is fully powered.
• Pond is fully operational with fish, snails, and tadpoles.

This pond is about 600 gallons and contains fish and tadpoles.


• Spa is being filled.
• Trees have been ordered.
• Front pathway is complete.

Craftsman walkway in front yard made of stone.