Visit the Craftsman Home Remodeling Website
Thursday, May 29, 2008
Biometric Fingerprint Garage Door Opener
What I like about it is that you can program a contractor's fingerprint into it for the one or two days he needs access without giving a numeric code. When he's done working, remove the fingerprint from the system and he's locked out!
Sunday, December 3, 2006
Garage Floor Upgraded with RaceDeck
The pieces snap together like a puzzle making it real fast and easy to complete. The hardest part was emptying and refilling my garage. The installation below took all of 2 hours.
Saturday, May 14, 2005
Roof Papered, Skylights In, Siding Ordered, Ceiling Layouts, Rough-Ins Continue
• Velux skylights will be added to the entry, and all downstairs bedrooms. These skylights have remotely controlled blackout blinds built in. I definitely wanted a chandelier in the entry but Amy was saying it was too dark. Our solution is to put in a 24"x24" skylight that is parallel to the floor instead of the vaulted ceiling. Wood trim will be placed around the opening to match window and door trims. From the four corners, wires will be strung to hold an as yet to be determined chandelier. I'll probably have to make it. I'm envisioning a 4-sided inverted pyramid with stained glass panels. During the day it will be illuminated by the skylight above and at night it will work as a regular chandelier, i.e., it will always be lit up.
• The cedar, shingle siding has been ordered from Cedar Valley in Hollister, California.
• Beam locations in the living room, dining room, and kitchen have been identified by string. This allowed rough-ins of plumbing, electrical, HVAC, and central vacuum systems. Inspection should be next week.