Monday, September 27, 2004

Start Demolition

With our temporary demo permit in place, we can start demolition. Now we aren't planning on tearing the entire house down but rather save as much as we can and do a minimal amount of changes. A full set of pictures with captions can be seen in the Photo Gallery.


Fireplace Demolition
The brick fireplace was just demolished.

Friday, September 24, 2004

Partial Demolition Permit Received

Well we got a permit to allow for a partial demolition. The Art Jury is holding this up saying that they want to see some details on the plans.

Wednesday, August 25, 2004

Hired General Contractor

Today we hired our general contractor, Rich Wright Construction. Rich was highly recommended by everyone I talked to and is a master woodworker. He also surfs!

Saturday, July 17, 2004

Go Out For Contractor Bids

Today we sent out packages to four different contractors to start the bid process. I used Service Magic to get matched up to contractors that could do this sort of work.
We need to get this going as the contractor will be pulling the permits.

Wednesday, July 14, 2004

City Plan Check Fees

The City asked for more money today to look at the plans.

Monday, April 19, 2004

Drawings Sent to Structural Engineer

The design Development drawings were sent to the structural engineer at Palos Verdes Engineering.