Fireplace Demolition
Visit the Craftsman Home Remodeling Website
Monday, September 27, 2004
Start Demolition
With our temporary demo permit in place, we can start demolition. Now we aren't planning on tearing the entire house down but rather save as much as we can and do a minimal amount of changes. A full set of pictures with captions can be seen in the Photo Gallery.
Friday, September 24, 2004
Partial Demolition Permit Received
Well we got a permit to allow for a partial demolition. The Art Jury is holding this up saying that they want to see some details on the plans.
Tuesday, September 21, 2004
School District Construction Fee
I hope this is the last one.
Wednesday, August 25, 2004
Hired General Contractor
Today we hired our general contractor, Rich Wright Construction. Rich was highly recommended by everyone I talked to and is a master woodworker. He also surfs!
Saturday, July 17, 2004
Go Out For Contractor Bids
Today we sent out packages to four different contractors to start the bid process. I used Service Magic to get matched up to contractors that could do this sort of work.
We need to get this going as the contractor will be pulling the permits.
We need to get this going as the contractor will be pulling the permits.
Wednesday, July 14, 2004
City Plan Check Fees
The City asked for more money today to look at the plans.
Monday, April 19, 2004
Drawings Sent to Structural Engineer
The design Development drawings were sent to the structural engineer at Palos Verdes Engineering.
Subscribe to:
Posts (Atom)