Visit the Craftsman Home Remodeling Website

Saturday, May 21, 2005

Low Voltage Wiring, Electrical, Plumbing, Garage Door Ordered, Issues in the Kitchen

• Still working on updating the pictures. They should be coming within the week.
• There is still quite a bit to do before inspection. We had a telecom installer come out and install phone (Cat 5), cable TV (RG6), and Ethernet (Cat 6). There was about 1700 feet of ethernet wiring installed. It's easier to put it in now than later. For example, it's behind TVs, in the kitchen, etc. I won't be using it but in 10 years or so it may be needed for home automation purposes. It's also a good selling point if I ever go down that path.
• Wall sconces have been wired.
• Plumbing is almost complete. Just finishing up the gas lines.
• The garage door has been ordered from Designer Doors. This is going to be really nice!
• Issues continue to test my patience in the kitchen. There are so many wires, pipes, and ducts running through the ceiling that we are having trouble figuring out how to get a 10" duct from the range hood over about 10" off center to fit between two joists and vent out the wall.
• The ceiling beam patterns are a challenge since we decided to add the kitchen into the remodeling mix. We decided to stop the ceiling beams at the boundary between the kitchen and dining room so the living and dining rooms only have beams. Kitchen ceiling is TBD.
• The remaining part of the block wall on the rear patio was cut down yesterday.

Saturday, May 14, 2005

Disaster Strikes My iPhoto Database

I'm still working on my disastrous photo database problem. I'm in the process of re-identifying the 1500 pictures with keywords so I can upload the new pics. Here is what happened. During an upgrade of iPhoto, I messed around with some file I shouldn't have and all of the keywords and captions associated with each picture was trashed. This will take months to get back to where I was.
Stay tuned...

Roof Papered, Skylights In, Siding Ordered, Ceiling Layouts, Rough-Ins Continue

• The roof has been covered with paper.

Craftsman Roof with Paper


• Velux skylights will be added to the entry, and all downstairs bedrooms. These skylights have remotely controlled blackout blinds built in. I definitely wanted a chandelier in the entry but Amy was saying it was too dark. Our solution is to put in a 24"x24" skylight that is parallel to the floor instead of the vaulted ceiling. Wood trim will be placed around the opening to match window and door trims. From the four corners, wires will be strung to hold an as yet to be determined chandelier. I'll probably have to make it. I'm envisioning a 4-sided inverted pyramid with stained glass panels. During the day it will be illuminated by the skylight above and at night it will work as a regular chandelier, i.e., it will always be lit up.
• The cedar, shingle siding has been ordered from Cedar Valley in Hollister, California.
• Beam locations in the living room, dining room, and kitchen have been identified by string. This allowed rough-ins of plumbing, electrical, HVAC, and central vacuum systems. Inspection should be next week.

Monday, May 9, 2005

Patio Poured, Ordered Door, Interior Design Starting

• The patio was poured.
• All doors are now installed except for the front door (being built) and the side door (just ordered it). The side door is made by TM Cobb. It is a Stickley model with a mantel from the Greene door.


T.M. Cobb Craftsman Stickley DoorT.M. Cobb Craftsman Greene Door

Edited October 29, 2005: The actual door interior and exterior.


• Hose bib locations have been identified.

INTERIOR DESIGN STARTING
I had no idea that I was going to be designing the interior of this house on the fly.
• Spent the last few days identifying all lighting that was not on the original plans. This includes wall sconces inside and outside.
• Roughly laid out the beam design separating the living room and dining room.

Tuesday, May 3, 2005

Windows In, Roof Sheeted, Ordered Fixtures, Lessons Learned

A lot has happened in the last 2 weeks. Here's the rundown.
• For the past week, I was pushing the masons to hurry up and put in a block wall around part of the patio according to the plans. Amy came over to see it that night and we both decided it was too tall and closed in the patio too much. The following day I had the guys tear it out. It wasn't very fun telling them that.
• Installed all windows. Working on doors now.
• Ordered the master bath plumbing fixtures in oil-rubbed bronze (Phylrich Carrara Beige Marble) and the steam shower system (Mr. Steam)
• The roof is sheeted, now it's ready for waterproofing.

Plywood Sheeted Roof


LESSONS LEARNED
• Heating ducts have been a pain in the neck. Multiple small changes have been needed to make the design work. A lesson learned is that none of the subcontractors know how the other is planning on roughing out their lines. As a result, heating ducts start to go in and one by one I tell them why it can't go in a certain spot. A soffit was created upstairs to handle the ducting. Downstairs, ducting is being run without knowledge of the final beam layouts on the finished ceiling. I'm having stuff moved. They wanted to run ducts right where I need my range vented out in the kitchen, etc., etc.
The bottom line is make sure you are on site a lot during the rough-ins to make sure everything works. Only you will know how the end product is going to be used.