Sunday, December 18, 2005

Wall Sconce Stained Glass, Wood Floors Being Installed

Yes, I'm delinquent with the update again.There are a lot more pictures that I haven't had a chance to put on the site yet so keep checking back. A lot is going on around here.
• I'm really busy now creating the stained glass for some authentic Gamble House reproductions. The stained glass will be different and my own design. I'll tie that into the front door window whenever I get around to it. Go to Old California Lantern Company to see the best Arts & Crafts lanterns. I went in there and 3 1/2 hours later I outfitted my entire house.



• The hardwood floors are being installed right now. It is long-length (8'-16'), quarter-sawn, 5"-wide, Brazilian Cherry. We are having a slight bevel put between the planks to give it an older look. The floor will be stained black, sanded, and then stained with a green dye to subdue the bright reds associated with Brazilian cherry.

Brazilian cherry floor installed in office

Thursday, December 15, 2005

Soapstone Counter Installation

The soapstone countertops were installed in the kitchen and laundry rooms today. The templates were made on Tuesday and the countertop was installed on Thursday. Soapstone West has great service!
Below is a play-by-play of the installation.


These guys drove in from Arizona, and within 2 days measured, fabricated, and installed the soapstone countertops.

These guys drove in from Arizona, and within 2 days measured, fabricated, and installed the soapstone countertops.

These slabs are HEAVY at 20 lbs/sq ft.

These slabs are heavy!

There is a 3/8" overlap of the sink. The holes for the faucet, soap, drinking water, and vent are drilled.

Kitchen soapstone is being installed around the sink.

Black epoxy is mixed up to join the soapstone pieces and fill in any voids.

Black epoxy is mixed up to join the soapstone pieces and fill in any voids.

A ding is repaired with the special epoxy. After it dries you can't even see it.

A ding is repaired with the special epoxy

Even through the talcum powder layer you can see the caramel vein showing through.

The soapstone counter pieces are being bonded together.

Soapstone installation is messy work.

Sanding soapstone is messy work.

Soapstone is much denser than granite and can't be stained. However, it is soft enough so that hand sanding can be accomplished to smooth the edges.

Soapstone is much denser than granite and can't be stained. However, it is soft enough so that hand sanding can be accomplished to smooth the edges.

This kitchen corner's soapstone installation is complete.

This looks gray now but wait until it's oiled.

Kitchen soapstone is installed

The range will slide in between these two pieces.

I oiled the soapstone with mineral oil. It's shiny because it's still wet. When dry, it will have a matte finish.

Freshly oiled soapstone in kitchen is shiny.

The counter looks great! The door to the laundry room has a "Delta" pattern in it.

Craftsman kitchen with freshly oiled soapstone

Thursday, November 3, 2005

The Finishes are Going In

Lately, I have been overwhelmed with the number of things going on at the house and though I have been taking pictures, I have not had time to annotate and post them. They will arrive, just a little patience.
• The master bathroom has been tiled and looks great!

Master bathroom is tiled in glass, slate, and seagrass limestone.


• Cherry cabinets have been installed in the kitchen, master bath, and laundry room. Unfortunately, the kitchen sink cabinet was 3/4" off center from the window. The cabinet had to be shortened by 3/4" on both ends to keep it symmetric and centered on the window.

Kitchen sink cabinet is off center.


• I have purchased the soapstone slabs for the kitchen and laundry room from Soapstone West in Escondido, CA.
• Brazilian Cherry floors have been ordered from Dutko Hardwood Floors in Lawndale, CA and will be installed the first week of December. Talk about a backlog.
• The fireplace mantel has been installed and stained. Plaster will go above it and Moonlight flagstone will go below. It will be cut into manicured blocks of varying size.

Craftsman Mahogany Fireplace Mantel


• Actual work has started on the staircase. There was a lot of planning to get to this point.
• The hot tub has been delivered. We're just waiting for power now.

The hot tub has been slid into place


• The Golden Busckskin flagstone has been installed on the front and back patios.

Golden Bucksking Flagstone has been installed on the patio


• The green slate has been installed on the balconies.
• Paint samples are all over the walls. I hear they will start within 2 weeks with the paint.

Paint samples are on the walls


• Interior doors are installed and stained.

Interior Craftsman door with Delta glass

Friday, September 2, 2005

Garage Door Installed, Interior Primed, Bathroom Floated, Ceiling Beams Installed

Not much has happened the last month. Vacations and other jobs have gotten in the way. However, the work that has been done is looking really good. So here's the run down.
• All interior doors have been ordered but we have to wait about a month. Expected delivery is 9/14/05.
• The garage door was installed.



• Interior of house and garage has had two coats of primer applied.
• Master bathroom has been floated and is ready for tile.
• The ceiling beams are being installed single-handedly by Dave Barlow. The planning for this was extremely difficult as there is quite a bit of wood and detail in a Craftsman style house. We are designing the layouts on the fly for the ceiling, crown moulding, plate/picture rail, floor trim, wainscoting, and staircase. All of these pieces tie together as one entire wood 'system'. Our design of this is staying about one or two steps ahead of the build. One problem is that we don't have our wood floors in yet so we can't build the jambs up from the floor.

Dave Barlow installs the living room beams

Friday, August 5, 2005

Camera Broken, Drywall Taped and Sanded, Starting Staircase, Siding Complete

• Bad news. I took a trip and my camera got some dirt in it. It now doesn't work so no pictures. The new camera should be coming in a few days.
• Drywall is sanded and just about ready for primer.

Drywall is taped and sanded. Ready for primer.


• Dave Barlow is working the staircase and will be doing other fine carpentry in the house. He is creating mockups of everything out of MDF (fiberboard) prior to cutting the real wood.

MDF Craftsman staircase mockup


• All shingle and stone siding is installed.

Craftsman shingle and stone siding is installed.

Monday, July 18, 2005

Staircase Design a No Go

Bad news today on the staircase. The building inspector will not allow us to create the design shown in an earlier blog . If you scale it out, the design has openings of up to one foot. Code is no more than four inches. We'll have to come up with something else. Whatever we decide on I can guarantee you that it will be spectacular. Stay tuned...

Sunday, July 17, 2005

Shingle Siding, Drywall Inspection, and Stone Siding

• The siding continues to go up. I think the variation in the tone makes it look very interesting. Anyway, it can't be stained until at least June 2006 so no need to worry about it now.
• Drywall inspection is tomorrow.
• Stone siding starts to go up this week.

Tuesday, July 5, 2005

Exterior House Work, Shingles May Be Too Colorful

• Got back from vacation and the house was all white instead of black when I left. It's covered now in a Tyvek waterproofing layer.
• The water table was installed. This separates the shingle siding from the stone base.
• Window trims are being installed.

Tyvek, shingles, and trim are installed on the house exterior.

• The drywall is almost complete. Inspection of the screws should take place this week with taping to follow.

Drywall before taping

• MAJOR ISSUE! The shingle siding is being installed and the color variation is a bit more than expected. On its own, it looks great but when the stone siding is added it may be too busy. We called Cabot Stains and asked them what we could do and they said we have to wait 1 year before we attempt to paint a different color stain on it. Oh well, live and learn.

Craftsman cedar shingles are very colorful

Wednesday, June 15, 2005

Survey Says...Move the Fence!

I have finally uploaded the pictures for the last 2 months.
• Today I went to the neighbor over my backyard fence to inform her that a survey was done and the fence needs to move about 10 feet onto her side. She said do whatever I need to do. Now wasn't that nice? I told her I'll landscape her side of the fence.
• The roofer has started to cover the black paper with a rough asphalt paper.
• The front door jamb has been installed.

Tuesday, June 14, 2005

Cabinets, Plumbing, Electrical, Insulation, Surround Sound, Roof Work, Shower Mopped,.....

I have been really busy and haven't had time for updates. I have finally organized the new pictures since my last posting on 4/16/05. I will load them up sometime this week, I promise. Here are the latest issues.
• All plumbing and electrical in the master bathroom has to shift to the left by about a foot since we had a designer lay out the cabinets.
• All insulation has been put in.
• I installed in-ceiling speaker brackets for surround sound in the living room.

Ceiling Speaker Bracket Installed


• Copper flashing is going on the roof.

Copper Flashing Installed on Roof


• The shower has been hot-mopped. We were told to pick out all bathroom tile and balcony and laundry room flooring this week.

Hot Mopped Shower


• Skylights have been framed.

Framed Skylight


• The kitchen range vent has been put in place. One of the joists had to be moved over and plumbing rerouted to make room.
• The Thermador range and Thermador dishwasher were delivered last week. I found a place in Alabama (Fredrickson's Tire and Appliance) with amazing prices through eBay. They were clearing out a supply of Thermador appliances from a warehouse that closed down. They bought everything up and were liquidating at wholesale prices.
• With the extended garage roof you now hit your head when walking around the corner. So, we dug down about 2 feet around the garage to lower the grade.

Saturday, May 21, 2005

Low Voltage Wiring, Electrical, Plumbing, Garage Door Ordered, Issues in the Kitchen

• Still working on updating the pictures. They should be coming within the week.
• There is still quite a bit to do before inspection. We had a telecom installer come out and install phone (Cat 5), cable TV (RG6), and Ethernet (Cat 6). There was about 1700 feet of ethernet wiring installed. It's easier to put it in now than later. For example, it's behind TVs, in the kitchen, etc. I won't be using it but in 10 years or so it may be needed for home automation purposes. It's also a good selling point if I ever go down that path.
• Wall sconces have been wired.
• Plumbing is almost complete. Just finishing up the gas lines.
• The garage door has been ordered from Designer Doors. This is going to be really nice!
• Issues continue to test my patience in the kitchen. There are so many wires, pipes, and ducts running through the ceiling that we are having trouble figuring out how to get a 10" duct from the range hood over about 10" off center to fit between two joists and vent out the wall.
• The ceiling beam patterns are a challenge since we decided to add the kitchen into the remodeling mix. We decided to stop the ceiling beams at the boundary between the kitchen and dining room so the living and dining rooms only have beams. Kitchen ceiling is TBD.
• The remaining part of the block wall on the rear patio was cut down yesterday.

Saturday, May 14, 2005

Disaster Strikes My iPhoto Database

I'm still working on my disastrous photo database problem. I'm in the process of re-identifying the 1500 pictures with keywords so I can upload the new pics. Here is what happened. During an upgrade of iPhoto, I messed around with some file I shouldn't have and all of the keywords and captions associated with each picture was trashed. This will take months to get back to where I was.
Stay tuned...

Roof Papered, Skylights In, Siding Ordered, Ceiling Layouts, Rough-Ins Continue

• The roof has been covered with paper.

Craftsman Roof with Paper


• Velux skylights will be added to the entry, and all downstairs bedrooms. These skylights have remotely controlled blackout blinds built in. I definitely wanted a chandelier in the entry but Amy was saying it was too dark. Our solution is to put in a 24"x24" skylight that is parallel to the floor instead of the vaulted ceiling. Wood trim will be placed around the opening to match window and door trims. From the four corners, wires will be strung to hold an as yet to be determined chandelier. I'll probably have to make it. I'm envisioning a 4-sided inverted pyramid with stained glass panels. During the day it will be illuminated by the skylight above and at night it will work as a regular chandelier, i.e., it will always be lit up.
• The cedar, shingle siding has been ordered from Cedar Valley in Hollister, California.
• Beam locations in the living room, dining room, and kitchen have been identified by string. This allowed rough-ins of plumbing, electrical, HVAC, and central vacuum systems. Inspection should be next week.

Monday, May 9, 2005

Patio Poured, Ordered Door, Interior Design Starting

• The patio was poured.
• All doors are now installed except for the front door (being built) and the side door (just ordered it). The side door is made by TM Cobb. It is a Stickley model with a mantel from the Greene door.


T.M. Cobb Craftsman Stickley DoorT.M. Cobb Craftsman Greene Door

Edited October 29, 2005: The actual door interior and exterior.


• Hose bib locations have been identified.

INTERIOR DESIGN STARTING
I had no idea that I was going to be designing the interior of this house on the fly.
• Spent the last few days identifying all lighting that was not on the original plans. This includes wall sconces inside and outside.
• Roughly laid out the beam design separating the living room and dining room.

Tuesday, May 3, 2005

Windows In, Roof Sheeted, Ordered Fixtures, Lessons Learned

A lot has happened in the last 2 weeks. Here's the rundown.
• For the past week, I was pushing the masons to hurry up and put in a block wall around part of the patio according to the plans. Amy came over to see it that night and we both decided it was too tall and closed in the patio too much. The following day I had the guys tear it out. It wasn't very fun telling them that.
• Installed all windows. Working on doors now.
• Ordered the master bath plumbing fixtures in oil-rubbed bronze (Phylrich Carrara Beige Marble) and the steam shower system (Mr. Steam)
• The roof is sheeted, now it's ready for waterproofing.

Plywood Sheeted Roof


LESSONS LEARNED
• Heating ducts have been a pain in the neck. Multiple small changes have been needed to make the design work. A lesson learned is that none of the subcontractors know how the other is planning on roughing out their lines. As a result, heating ducts start to go in and one by one I tell them why it can't go in a certain spot. A soffit was created upstairs to handle the ducting. Downstairs, ducting is being run without knowledge of the final beam layouts on the finished ceiling. I'm having stuff moved. They wanted to run ducts right where I need my range vented out in the kitchen, etc., etc.
The bottom line is make sure you are on site a lot during the rough-ins to make sure everything works. Only you will know how the end product is going to be used.

Saturday, April 16, 2005

First Window Installed

Today I helped install the first windows. They look even better than I hoped they would.

First Installed Loewen Window

Thursday, April 14, 2005

Windows and Doors Delivered

The Loewen windows and doors were delivered today. There is a scratch on the 8' french doors. Somebody will need to come out and fix that. I'm told it will be after all exterior work is complete.


Tuesday, April 12, 2005

Everyone is Working, Picking Fixtures, Designing Landscape, Where's My Garage

• The rough plumbing is going well. Only about 4 more days until it's done.
• The master bathroom shower, sink, and tub fixtures were picked today. They are made by Phylrich - Carrara Beige Model Series. The finish is oil rubbed bronze with the beige marble handles.
• Chose Mr. Steam MS-400T for the master bath steam shower. I purchased it and then found it for about $150 less. Oh well, maybe I'll save next time. This site has everything!

Mr. Steam MS 300T


• The electrician started today and mounted electrical boxes around the house. It seems the code of a box every 6 feet is excessive.
• The garage was torn down today due to wood rot and termites in preparation for the new garage framing and roof. This was not part of the original plan.

Garage Torn Down


• Hired John Bauman, landscape designer and former owner of the Begonia Farm Nursery.

Monday, April 4, 2005

Fireplace Construction Starts

Pete Ramage of Ramage Masonry has started the fireplaces and the plumber, Jaime, is putting in the gas lines to them.


Thursday, March 31, 2005

Eaves and Rafters Stained Today

Craftsman eaves and rafters were stained.
The eaves and rafters were stained today using Cabot Stain's Bark color. I had everything brushed so it would reveal the grain better and give it an older look. It worked!!! When the painters first started, they were spraying and we had to stop that fast. Instead of seeing the grain like in this picture, everything looked solid brown.

Wednesday, March 30, 2005

Paint Colors Selected and Front Door Started

• Today we finally picked the actual colors of the house. The shingle siding is a clear-coated natural cedar. The window and door trim, rafters, and eaves are Cabot Semi-Transparent redwood stain. The balcony railings and trim are Passion Vine, an olive-green color. All colors except for the siding were actually choices I made after the Art Jury told me what they liked. It was easier that way since it gave me fewer choices.

• Gave Joe Madden of Madden Millworks in San Pedro the go-ahead to start construction of the front door.

Sunday, March 6, 2005

Front Door Design

I'm working on the front door right now. This picture is a sketch of what I'm trying for with a darker (mahogany) wood. I'm going to do the stained glass myself along the lines of what is shown.

Rough Idea
Mockup of my proposed Craftsman Front Door

By the way, the rain is coming again next week. We should get another 2 inches which will push L.A. up to the second rainiest ever. I guess I was just lucky to start building this year during this monsoon season. Maybe we can be number one soon. UGH!
------------------------------------------------------------------------